GUI Workflow

Prerequisites

Install ESFEX with GUI dependencies:

pip install esfex

This installs PySide6 and QWebEngine. Requires Python 3.10+ and a display of at least 1280x720 (1920x1080 recommended).


Step 1: Launch the Editor

# Start with a blank project
esfex studio

# Or edit an existing configuration
esfex studio -c existing_system.yaml

# Open and auto-center on a specific system
esfex studio -c config.yaml --system "isla_juventud"

The editor window has three main panels:

  • Element Tree (left, ~20% width) — hierarchical overview of all objects
  • Map / SLD View (center, ~55% width) — interactive Leaflet.js map for placing and connecting elements
  • Properties Panel (right, ~25% width) — editable form for the selected element

Below the map, a Python Console (left) and Script Editor (right) provide programmatic access to the data model.


Step 2: Create a New System

  1. Click the Add System button in the toolbar (it remains disabled until clicked for the first time in a blank project).
  2. A name dialog appears. Enter a descriptive name, for example Cuba_Western_Grid. System names must be unique and should not contain spaces (use underscores instead).
  3. Click OK. The new system appears as a bold top-level node in the Element Tree, with empty categories underneath: Nodes, Generators, Batteries, Transmission Lines, and so on.

Drawing mode buttons become enabled once a system exists.

Multiple Systems

You can create additional systems later for multi-system studies. Each system is independent and can be interconnected via inter-system links.


Step 3: Place Nodes on the Map

Nodes represent substations, load centers, or any point where generation, load, or transmission converge.

  1. Click the Node button in the toolbar to enter node placement mode. The cursor changes to a crosshair.
  2. Click on the map at the location of your first substation or load center. A numbered marker appears (e.g., "Node 0").
  3. Continue clicking to place additional nodes. Each receives an auto-incremented index (Node 0, Node 1, Node 2, ...).
  4. When finished, press Escape or click the Select button to exit placement mode.

Place three nodes for a three-bus system.

Configuring Node Properties

Click any node marker on the map or in the Element Tree. The Properties Panel shows:

  • Name: Give the node a human-readable name (e.g., "Havana", "Cienfuegos", "Camaguey")
  • Coordinates: Latitude and longitude (auto-filled from where you clicked; editable for precision)
  • Demand File: Path to the demand data file (Excel or CSV) for this node. If demand is specified at the system level, individual node demand files are optional.

Map Navigation

Double-click any node in the Element Tree to center the map on that node. Use the mouse scroll wheel to zoom. Click and drag to pan.


Step 4: Add Generators to Nodes

Generators represent power plants — both existing units and investment candidates.

  1. Click the Generator button in the toolbar to enter generator placement mode.
  2. Click on the map near a node. The generator icon snaps automatically to the nearest node (magnetic snapping).
  3. The Properties Panel immediately shows the generator configuration form.

Configuring Generator Properties

Field Description Example
Name Human-readable label "Solar PV"
Type Renewable or Non-renewable Renewable
Fuel Energy source (Solar, Wind, Diesel, Natural Gas, etc.) Solar
Rated Power (MW) Existing installed capacity at this node 50.0
Investment Cost ($/MW) Per-MW cost for new capacity 700000
Max Investment (MW) Maximum new capacity allowed at this node 200.0
Fuel Cost ($/MWh) Variable fuel cost (0 for renewables) 0.0
Fixed Cost ($/MWh) Fixed O&M cost 5.0
Maintenance Cost ($/MWh) Variable O&M cost 2.0
Lifetime (years) Expected operational lifetime 25
Initial Age (years) Current age of existing unit 0
Efficiency at Rated Thermal efficiency at full load 1.0
Degradation Rate Annual capacity loss fraction 0.005
Availability Profile Path to CSV file with hourly capacity factors solar_profile.csv

For a typical three-node island system, add:

  • Node 0: Solar PV (50 MW existing, 200 MW max investment) + Diesel Generator (30 MW, no new investment)
  • Node 1: Wind (20 MW existing, 100 MW max investment) + Diesel Generator (20 MW)
  • Node 2: Diesel Generator (40 MW) + Gas Turbine (25 MW)

Each new generator appears under the Generators category in the Element Tree.

Cost Curves (Advanced)

For generators with non-linear cost characteristics, expand the Cost Curve section in the Properties Panel. You can choose from four curve types:

  • Flat: Constant marginal cost at all output levels
  • Linear: Price ramps from price_at_zero to price_at_max
  • Stepwise: Piecewise blocks (e.g., first 40% at $45/MWh, next 30% at $55/MWh, last 30% at $75/MWh)
  • Exponential: price(P) = base_price * exp(scale_factor * P/P_max)

Step 5: Add Batteries

Battery storage follows the same placement pattern as generators.

  1. Click the Battery button in the toolbar.
  2. Click near a node on the map. The battery icon snaps to the nearest node.
  3. Configure in the Properties Panel:
Field Description Example
Name Human-readable label "Li-Ion 4h"
Energy Capacity (MWh) Total storage capacity 0 (no existing)
Max Charge Power (MW) Maximum charging rate 0
Max Discharge Power (MW) Maximum discharging rate 0
Charge Efficiency Round-trip charge efficiency 0.95
Discharge Efficiency Round-trip discharge efficiency 0.95
SOC Min / Max State of charge limits (fraction) 0.10 / 0.95
SOC Initial Starting state of charge 0.50
Invest Cost Power ($/MW) Cost for power capacity 180000
Invest Cost Energy ($/MWh) Cost for energy capacity 120000
Max Investment Power (MW) Maximum power investment 100
Max Investment Energy (MWh) Maximum energy investment 400
Min/Max Duration (hours) E/P ratio bounds 2.0 / 8.0
Lifetime (years) Expected lifetime 15

Battery SOC Cyclic Constraint

ESFEX enforces SOC(t_last) == SOC(t_initial) at the end of each operational day. This prevents the optimizer from treating batteries as free energy sources.


Step 6: Draw Transmission Lines with Polyline Traces

  1. Click the Line button in the toolbar to enter line drawing mode.
  2. Click on the starting node (the source). A dashed rubber-band line appears from that node to your cursor.
  3. Click on the map at intermediate waypoints to route the line geographically (along roads, around obstacles, etc.). Each click adds a waypoint to the polyline.
  4. Click on the destination node to finish the line. The polyline trace is completed and appears as a solid line on the map.
  5. Press Escape at any time to cancel the current trace and discard all waypoints.

Configuring Line Properties

Click a drawn line on the map or in the Element Tree:

Field Description Example
Capacity (MW) Thermal transfer capacity 100.0
Reactance (p.u.) Per-unit reactance (for DC power flow) 0.05
Resistance (p.u.) Per-unit resistance 0.01
Length (km) Physical line length (auto-calculated from waypoints) 200.0
Voltage (kV) Nominal voltage level 220.0

Draw three lines to create a fully connected network:

  • Node 0 to Node 1: 100 MW capacity
  • Node 1 to Node 2: 50 MW capacity
  • Node 0 to Node 2: 75 MW capacity (optional direct link)

Parallel Lines

You can draw multiple lines between the same pair of nodes. The serializer automatically sums their capacities in the adjacency matrix. Each line retains its own line_id and individual capacity.


Step 7: Add Fuel Entry Points

Fuel entry points define where fuel enters the network (required for diesel, natural gas, etc.).

  1. Click the Fuel Entry button in the toolbar.
  2. Click near the node where fuel is imported (e.g., a port node).
  3. Configure in the Properties Panel:
Field Description Example
Fuels List of fuel types available at this point [diesel]
Max Import Rate Maximum fuel import rate (tonnes/period) 500.0
Import Cost Landed cost per tonne 850.0

Fuel entry points are only relevant when enable_primary_energy: true.


Step 8: Configure System-Level Settings

Click the system name in the Element Tree. The Properties Panel shows:

General Settings

Field Description Example
Demand File Path to system-wide demand data demand.xlsx
Demand Scale Multiplier applied to all demand 1.0
Demand Growth Annual growth rate 0.02 (2%)
Discount Rate For NPV calculations 0.05 (5%)

RE Targets

Field Description Example
Target RE Penetration Final-year RE fraction target 0.80 (80%)
Initial RE Penetration Starting RE fraction (0 = auto-calculate) 0.0
Min Annual Increment Minimum yearly RE increase 0.02
Max Annual Increment Maximum yearly RE increase 0.10

Penalties

Field Description Example
Loss of Load VOLL in $/MW (must be very high) 10000000.0
Curtailment Cost of curtailing RE ($/MWh) 100.0
Max Curtailment Ratio Max fraction of RE that can be curtailed 0.05
CO2 Cost Carbon price ($/tCO2) 10.0

CO2 Budget

Field Description Example
Enabled Activate CO2 budget constraint true
Annual Budget Maximum CO2 emissions per year (tonnes) 500000.0

DC Power Flow (Advanced)

Field Description Example
Enabled Use linearized power flow (vs. transport model) true
Base Impedance System base impedance (Ohms) 100.0
Max Angle Difference Maximum voltage angle difference (degrees) 30.0

Step 9: Configure Global Settings

Click Global Settings at the top of the Element Tree. These apply across all systems:

Simulation

Field Description Options
Mode Simulation type development (LP) or unit_commitment (MIP)
Date Start Simulation start date 01/01/2025 00:00

Solver

Field Description Example
Solver Optimization solver highs, gurobi, cplex, cbc, glpk
Threads Parallel solver threads 4
Time Limit Max solve time (seconds) 3600
MIP Gap Optimality gap for MIP 0.01

Temporal Resolution

Field Description Example
Resolution (hours) Time step size 1
Rolling Horizon Enable rolling horizon dispatch true
Window Size (hours) Rolling horizon window 48
Overlap (hours) Window overlap for continuity 6

Master Problem

Field Description Example
Representative Days Days per year for operational validation 5
Min Day Separation Minimum days between representatives 7
MGA Enabled Near-optimal alternative exploration false

N-1 Security

Field Description Example
Enabled Activate contingency analysis false
Transmission Transmission contingency false
Generation Generation contingency false

Step 10: Add More Systems (Multi-System Workflow)

  1. Click Add System in the toolbar. Enter a name (e.g., "Isla_Juventud").
  2. Switch between systems by clicking their names in the Element Tree.
  3. Place nodes, generators, batteries, and lines following the same workflow.
  1. Click Inter-system Links in the Element Tree.
  2. In the Properties Panel, configure the connection:
Field Description Example
Systems Pair of systems to connect [Cuba_Western_Grid, Isla_Juventud]
From Nodes Node indices in system A [2]
To Nodes Node indices in system B [0]
Capacity (MW) Existing interconnection capacity 50.0
Invest Cost ($/MW) Cost for capacity expansion 500000.0
Max Investment (MW) Maximum expansion 200.0

Step 11: Validate the Configuration

  1. Click Validate in the toolbar.
  2. The validation dialog runs checks across six categories:
  3. Structural integrity: Node count, index consistency
  4. Electrical parameters: Generator/battery parameter ranges, efficiency bounds
  5. Demand data: File existence, format, row count
  6. Generation adequacy: Sufficient capacity to meet peak demand
  7. Fuel network: Fuel entry points connected to generators that need them
  8. Connectivity: All nodes reachable, no isolated equipment

  9. Results are grouped by severity:

  10. Errors (red) — must be fixed before running
  11. Warnings (yellow) — advisory, do not prevent simulation
  12. Info (blue) — informational messages

  13. Double-click any issue to navigate directly to the affected element on the map.

Fix all errors before proceeding. Common errors: mismatched array lengths (per-node arrays must have exactly num_nodes entries), missing demand files, and generators with zero rated power and zero max investment.


Step 12: Run the Simulation from the GUI

  1. Click Run in the toolbar. The Run button is only enabled after a successful validation.
  2. The Simulation Dialog opens with:
  3. A progress bar tracking year-by-year and window-by-window progress
  4. A live log viewer showing solver output
  5. Cancel and Close buttons

  6. The simulation runs esfex run as a subprocess. Progress is parsed from log messages (e.g., "Year 2025 (1/25)", "Window 3/208").

  7. When complete, the dialog shows "Optimization completed successfully!" and the Close button becomes enabled.

Alternatively, run from the CLI after exporting:

esfex run -c my_system.yaml --years 25 -v

Step 13: View Results

  1. Click Results in the toolbar. The Results panel opens with:
  2. Summary table: Total cost, RE penetration, emissions by year
  3. Generation dispatch charts: Stacked area charts showing hourly generation mix
  4. Investment timeline: Bar charts showing capacity additions by technology and year
  5. Power flow maps: Arrows on the map showing transmission flows (available in the Results layer)

  6. Switch to the Results layer in the Layer dropdown to see power flow arrows, generation heatmaps, and load shedding indicators overlaid on the map.

  7. Click Sensitivity in the toolbar (available after simulation) to launch a Sobol sensitivity analysis on the solved model.

Accessing Results Programmatically

Results are stored in HDF5 format. Use the Python Console:

import h5py

with h5py.File("results/results_Cuba_Western_Grid.h5", "r") as f:
    print(list(f["summary_results"].keys()))
    costs = f["summary_results/total_cost"][:]
    re_pen = f["summary_results/re_penetration"][:]
    for y, (c, r) in enumerate(zip(costs, re_pen)):
        print(f"Year {y+1}: Cost=${c:,.0f}, RE={r:.1%}")

Step 14: Save and Export

Action Shortcut Format Includes
Save Ctrl+S YAML + GUI metadata Visual layout, map positions, marker styles, editor state
Export Ctrl+Shift+S Clean YAML Only optimization-relevant data, suitable for esfex run

The saved file can be reopened with full visual fidelity. The exported file is a minimal YAML the CLI can process directly.


Keyboard Shortcuts Reference

Shortcut Action
Escape Cancel drawing mode / deselect element
Delete Delete selected element
Ctrl+Z Undo last action
Ctrl+C Copy element properties
Ctrl+V Paste properties onto selected element
Ctrl+D Duplicate element
Ctrl+F Focus search box in Element Tree
Ctrl+O Open / Import YAML
Ctrl+S Save project
Ctrl+Shift+S Export clean YAML
Ctrl+N New blank project
Ctrl+, Open Preferences

Tips and Best Practices

  • Drag nodes to reposition them. Attached generators, batteries, fuel entries, and line endpoints move automatically.
  • Double-click any element in the Element Tree to center the map on it.
  • Ctrl+Click to select multiple elements for batch editing (e.g., set the same fuel cost for all diesel generators).
  • Use the Appearance section in property forms to customize marker colors, icon sizes, and line widths.
  • Switch visual themes under File > Preferences > Theme: Light (default), Dark, or Twilight.
  • Import geographic data (GeoJSON, Shapefile, KML) via File > Import Geographic Data to quickly populate nodes and lines from existing GIS datasets.
  • Use the Python Console for batch operations: for g in state.generators: g.fuel_cost = [85.0] * len(g.fuel_cost).
  • Use Dry Run mode (esfex run -c config.yaml --dry-run) to validate and preview the simulation plan without solving.